Contact
Copyright © 2025 PIKON International Consulting Group GmbH
Home » Success Stories » Implementation of SAP S/4HANA at Busch and Pfeiffer
Implementation of SAP S/4HANA as a joint ERP system for the two core brands “BUSCH VACUUM SOLUTIONS” & “Pfeiffer Vacuum+Fab Solutions” of the Busch Group, including worldwide rollouts.
The Busch Group is a globally leading provider of vacuum solutions for every conceivable application and industry. The three core brands are Busch Vacuum Solutions, Pfeiffer Vacuum+Fab Solutions, and centrotherm clean solutions.
We have been successfully working with PIKON in S/4HANA projects worldwide for years. I particularly appreciate the consultants’ high level of IT and process expertise, which goes far beyond the scope of the respective SAP module. With PIKON, we have a committed, reliable and pragmatic partner with whom we are always happy to work.
The two core brands, Busch Vacuum and Pfeiffer Vacuum, did not have a shared ERP system. Busch was already using SAP S/4HANA in some subsidiaries, while Pfeiffer operated with SAP ECC and various non-SAP systems. A unified system was introduced to realise synergies.
To transition Busch Vacuum and Pfeiffer Vacuum to a unified SAP S/4HANA system, a global template for Sales and Service companies was initially developed. This template standardizes and harmonizes all relevant business processes.
As a pilot project, the template was implemented at four locations: Busch Maulburg (headquarters), Busch Switzerland, Pfeiffer Switzerland, and Pfeiffer Italy between March 2022 and March 2023.
PIKON was responsible for Controlling, Systems (Project System), Reporting, and Production.
In the Systems area, a global rollout of the SAP Project System (PS) module was designed for Engineer-to-Order (ETO) processes. A complete end-to-end process was developed, covering the entire cycle from opportunity management to final invoicing in close collaboration with all relevant departments. A standardized Work Breakdown Structure (WBS) was defined, along with the use of network planning, CATS (Cross-Application Time Sheet), milestones (including billing relevance), project manufacturing (PP), and the integration of WBS BOMs and routings. Additionally, reports were developed to support project controlling and delivery tracking.
This template serves as the foundation for global rollouts (March 2023 – present) and was further expanded with additional functionalities for manufacturing companies during the implementation at Pfeiffer’s main site in Asslar, Germany. In the Project System (PS) module, new processes for R&D and internal projects were introduced.
Successful rollouts have already been completed for Busch Korea, Pfeiffer US, Busch Canada, and Busch US.
Further rollouts are currently in progress for Pfeiffer/Busch UK, Busch Group Sweden, Busch Spain, and Busch Japan.
Register for a free and non-binding PIKON newsfeed here and receive our latest blog posts with expert knowledge on digitisation and SAP topics by email once a month. After your registration you will receive an email in which you please confirm the link once again (double opt-in procedure).
You are currently viewing a placeholder content from Active Campaign. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.
More InformationYou need to load content from reCAPTCHA to submit the form. Please note that doing so will share data with third-party providers.
More Information